June 20, 2008—Well problem resolved (somewhat) | ||
Here is another shot of the fireplace along the trims. Even with them in the way, you can see that it will be framed through the dining room arch. I want to make sure, that we get the chimney right. | ||
Here are Kai and Joe Gaitan the plaster contractor figuring out the dimensions that the chimney should have. They will make up another foam core and we will take a look at that. | ||
I finally was able to fool my camera enough to get some detail on the dining room cabinets. The end cupboards will hold glassware and vases. I hope we have enough space for all our stuff because our current hutch is very crowded. | ||
The clerestory windows in the kitchen/family room have been trimmed out. They need to be caulked and painted again, but this is really the final look for them | ||
The trim is only finished on the clerestories, there still is head trim, picture rail, and a plate shelf on the right side of the room to be installed. | ||
The mortar bed for the tile has been laid on top of the master bath vanity. I am now obsessing about whether our high, arched faucets will fit under the medicine cabinets. What will I do with my life when I no longer have all these details to worry about? | ||
Back to top |