June 6 , 2008—Exterior color preview
The library is full of kitchen drawers as well as bookshelf boxes.
The guest bathroom tub tile is almost complete. The tile behind the tub has been grouted but the wainscot tile is still waiting for the installation of the vanity counter top.
The sliding doors for the hall closet have been installed.
This is the inside of the laundry room looking toward the mechanical closet. The door from the hall is standing open. This room will lose its roomy look once the washer, dryer, sink and sorting table are in on the left wall and the mangle and ironing board are set up on the right.
Back to top