| June 6 , 2008—Exterior color
preview |
 |
The library is full of kitchen drawers as
well as bookshelf boxes. |
 |
The guest bathroom tub tile is almost complete.
The tile behind the tub has been grouted but the wainscot tile is still
waiting for the installation of the vanity counter top. |
 |
The sliding doors for the hall closet have been
installed. |
 |
This is the inside of the laundry room looking
toward the mechanical closet. The door from the hall is standing open.
This room will lose its roomy look once the washer, dryer, sink and sorting
table are in on the left wall and the mangle and ironing board are set
up on the right. |
|
Back to top |